shortcut to content
Schuylerville masthead graphic
arrow bulletnews from around the district  [link to news archives]

A new look for the High School building

New High School Facade
Architectural rendering showing the panels and windows that will be added to the current High School building

Phase 4 of the district's construction project will include changes to the front of the current High School building. Orange panels will be added to the  front of the structure. The panels are necessary to provide insulation to the building and to alleviate issues pertaining to water damage. The school will also have new, energy-efficient windows installed.

SEI Design Group, the architectural firm overseeing the capital project, provided a rendering to show how the building will look when the changes are made during the summer months of 2012. See the rendering at the right or click here to view a larger PDF version.